如何查看住宅附近的规划申请
应阅读申请、图纸、决定及附带条件。地图标记或申请数量不能反映工程规模、景观或施工影响。
决定期限
一般申请通常为 8 周,大型开发为 13 周,需要环境影响评估的申请为 16 周,除非双方书面同意延长。
- Eia weeks
- 16
- Major weeks
- 13
- Standard weeks
- 8
Planning Inspectorate procedural guide. applications dated on or after 2026-04-01. 提取日期 2026-08-03.
How this was counted
Postcode district. statutory determination periods unless a written extension is agreed.
许可及施工
规划许可通常要在 3 年内开工。应查看条件是否解除及工程是否开始,不要假设每项批准都会落实。
- Usual start years
- 3
MHCLG plain English guide to the planning system. guidance verified 2026-08-03. 提取日期 2026-08-03.
How this was counted
Postcode district. usual period in which a permission must be started.
阅读文件
把建议高度、体量、窗户、出入口及施工时间,与考虑中的住宅位置比较。决定通知及批准图纸可证明获准内容。
England
- Eia weeks
- 16
- Major weeks
- 13
- Standard weeks
- 8
Planning Inspectorate procedural guide. applications dated on or after 2026-04-01. 提取日期 2026-08-03.
How this was counted
Postcode district. statutory determination periods unless a written extension is agreed.
England
- Usual start years
- 3
MHCLG plain English guide to the planning system. guidance verified 2026-08-03. 提取日期 2026-08-03.
How this was counted
Postcode district. usual period in which a permission must be started.
Sources and method
- Planning Inspectorate procedural guide. applications dated on or after 2026-04-01. 提取日期 2026-08-03.
- MHCLG plain English guide to the planning system. guidance verified 2026-08-03. 提取日期 2026-08-03.
如需指定地址的桌面核查,Property Diligence 付费报告会加入公开来源可提供的房产层级详细资料。