How to read planning applications near a home

Read the application, drawings, decision and conditions. A map pin or application count cannot show the scale, outlook or construction effect.

Decision periods

The usual decision period is 8 weeks for standard applications, 13 weeks for major development and 16 weeks where an environmental impact assessment is required, unless a written extension is agreed.

Eia weeks
16
Major weeks
13
Standard weeks
8
Planning Inspectorate procedural guide. applications dated on or after 2026-04-01. Retrieved 2026-08-03.
How this was counted

Postcode district. statutory determination periods unless a written extension is agreed.

Permission and delivery

Permission usually needs to be started within 3 years. Check whether conditions were discharged and whether work began, rather than assuming every approval will be built.

Usual start years
3
MHCLG plain English guide to the planning system. guidance verified 2026-08-03. Retrieved 2026-08-03.
How this was counted

Postcode district. usual period in which a permission must be started.

Reading the file

Compare the proposed height, massing, windows, access and working hours with the home you are considering. The decision notice and approved drawings establish what was allowed.

England

Eia weeks
16
Major weeks
13
Standard weeks
8
Planning Inspectorate procedural guide. applications dated on or after 2026-04-01. Retrieved 2026-08-03.
How this was counted

Postcode district. statutory determination periods unless a written extension is agreed.

England

Usual start years
3
MHCLG plain English guide to the planning system. guidance verified 2026-08-03. Retrieved 2026-08-03.
How this was counted

Postcode district. usual period in which a permission must be started.